Start my Permit (954) 616-5823

Open and expired permits are common on older City of Miami homes and buildings, and they often come up right when you’re trying to sell, refinance or start a new project. This guide explains who issues permits in the City of Miami, how to look up a permit in iBuild, what permit statuses mean, and how the city’s extension and completion process works. Every case is different, and approval always rests with the city’s Building Department.

Who issues permits in the City of Miami?

The City of Miami Building Department issues building permits for properties inside City of Miami limits. Properties elsewhere in Miami-Dade are handled by their own city or, in unincorporated areas, by Miami-Dade County, so confirm which one covers your address first.

The city’s permitting runs through its ePlan system, which has two parts. The city says iBuild is used for submitting and managing building permit applications, and ProjectDox is used to review and approve the digital plans and documents. In iBuild you can apply for permits, track applications, print approved permits, extend permits and schedule inspections.

The Building Department is at the Miami Riverside Center (MRC), 444 SW 2nd Ave, 4th floor, Miami, FL 33130. Phone: (305) 416-1100. Email: building@miamigov.com.

How to look up a permit in iBuild

The city says you’ll need a process number, the project’s address or the full folio number to view permit history. A process number is assigned when an online application starts in iBuild, a permit number is issued when the permit is pulled, and the folio is the 13-digit number the county assigns to every property.

  1. Create an iBuild account or log in. The city’s permit history steps start with an iBuild login.
  2. Enter your permit number or process number in the search field and click the magnifying glass.
  3. Read the General Info tab. The city says it shows whether the permit is active, the project cost, and the issue and expiration dates.
  4. Check the other tabs. Events, Required Inspections/Documents and Certificates show what has happened on the permit and what’s still required.
  5. Look up the inspection history. Go to the Inspections menu, select View Permit Inspections History, enter the permit number, and click it in the results.

If you search by process number, the Global Inquiry page shows the property address, folio and job category, and lets you open Plan History and Review Status.

What “open,” “expired” and “final” mean

  • Open (active): The permit was issued and is still within its time limit, but not all required inspections have been approved.
  • Expired: The permit’s time ran out. The city explains that a permit is valid for 180 days from the date of issuance or from the last approved inspection.
  • Final: All required inspections have been approved and the permit is closed. Keep proof of the final for your records and any future sale.

Typical steps to close or reactivate a permit

The City of Miami has two separate processes, and the one you use depends on whether the permit has already expired.

1. The permit is still active: request an extension. The city says a permit may be extended once before its expiration date, for 180 days from the date of the request, and you can request it in iBuild regardless of project cost. In iBuild, click Manage Permit, select Extend Permit, search for the permit number, and follow the steps through checkout. Once completed, the city adds 180 days to the expiration date.

2. The permit has expired: request a permit completion. The city says a Permit Completion makes an expired permit active again and gives you 180 days to finish the work and finalize inspections. How you apply depends on the cost of the work remaining:

  • $10,000 or less: In iBuild, click Manage Permit, select Complete Permit, search for the permit number, review the General Information and Permit Holder sections, enter the value of work remaining, and finish the steps.
  • More than $10,000: The request is reviewed and approved by the Chief for that trade and must be sent by email. Download the paper application, complete it, and select “Completion Permit” in the Change to Existing Permit section. If the original contractor is no longer available, the city says both the property owner and the new contractor must sign and the “Change of Contractor” box must be checked. The paperwork must be signed by the contractor, notarized, and emailed as a PDF to the Building Department.

3. Schedule and pass the remaining inspections. iBuild is where inspections are scheduled. Once every required inspection is approved, the permit can be finaled.

4. Work was done without a permit. For properties with a violation, the city says no building permit will be issued to a homeowner to cover illegal work. The work must be done by a general contractor or specialty contractor licensed for it, permits must be obtained for all of the work, and an architect’s, engineer’s or special inspector’s report may be required for concealed work.

Owner-builder notes

The City of Miami limits owner-builder permits to owner-occupied one-family and two-family homes. According to the city:

  • You must show proof of ownership, such as a recorded deed or a Miami-Dade County tax receipt statement, with the property in your name, not a business entity.
  • You must prove to the Building Official that you have the knowledge and ability to do the work. A short interview is required, and a multiple-choice test is given.
  • You must show that you live at the property. Bring an ID listing the property address and a utility bill with your name and the property address.
  • You’ll sign and notarize a disclosure statement before the permit can be issued.
  • This is done in person at the Homeowner Assistance counter, MRC, 444 SW 2nd Ave, first-floor lobby, between 7:30 AM and 4:30 PM.
  • No more than one master permit is issued to an owner for new construction, an addition or an alteration of a home in any 24-month period. Roofing, electrical, mechanical, plumbing and gas permits may only be issued to appropriately licensed contractors.

Free South Florida Owner-Builder & Contractor Permit Checklist

Get our free checklist: what to gather and the steps to follow before you apply.

Get the free checklist

FAQ

Do I need an iBuild account to look up a City of Miami permit?
Yes. The city’s permit history steps start by creating an iBuild account or logging in, then searching by permit or process number.

How long is a City of Miami permit valid?
The city says a permit is valid for 180 days from the date of issuance or from the last approved inspection.

Can I extend a permit that has already expired?
No. The city says an extension can only be requested for active permits. If your permit has expired, you request a Permit Completion instead.

What if my contractor is gone and the permit expired?
For a completion over $10,000, the city says both the property owner and the new contractor must sign the application and check the “Change of Contractor” box.

Can I fix a violation myself as an owner-builder?
For properties with a violation, the city says no building permit will be issued to a homeowner to cover illegal work. The work must be done by a properly licensed contractor.

Get Permit Help

Dealing with an open or expired permit in the City of Miami? Permit Busters can help you review the iBuild record, understand whether you need an extension or a completion, and prepare the paperwork. Get Permit Help: call (954) 616-5823 or email info@permitbusters.com, Monday through Friday, 9 AM to 5 PM.

This guide is general information, not legal or engineering advice. Requirements change, and approval rests with the City of Miami Building Department. Confirm details with the city before you act.

Call (954) 616-5823