A certified letter says your building is due for recertification. It may say “40-year,” “50-year,” “Building Safety Inspection Program” or “milestone inspection.” For a condo board, manager or owner, the question is the same: what do we do first, and how much time do we have?
This guide explains what these notices usually mean in Miami-Dade, Broward and Palm Beach, who does what, and where permits come in. Rules and deadlines vary by city and county, so always read your own notice closely and confirm the details with the building department that sent it.
What is a building recertification notice?
It’s a formal notice that a building has reached the age when the right engineer or architect must inspect it and file a report. Names differ by area:
- Miami-Dade County: Miami-Dade has run a building recertification program since 1975 (still often called the “40-year” or “50-year” recertification). Under the current county code, buildings generally come due at 30 years, or 25 years for condo and co-op buildings three stories or taller within three miles of the coast, and then every 10 years. In the City of Miami, the program is handled by the Building Department’s Unsafe Structures Section.
- Broward County: Broward’s Building Safety Inspection Program (Board of Rules and Appeals Policy 05-05) calls for structural and electrical inspections once a building reaches 25 years from its certificate of occupancy, then every 10 years. Each city’s building official sends the notices.
- Florida milestone inspections: State law (section 553.899, Florida Statutes) requires milestone structural inspections for condominium and cooperative buildings three habitable stories or more, generally at 30 years and every 10 years after. Local agencies may set 25 years for buildings near salt water. In unincorporated Palm Beach County, the county building division handles these, and many cities run their own.
Some property types are exempt. For example, Miami-Dade’s program does not apply to single-family homes, duplexes, or buildings with an occupant load of 10 or less that are 2,000 square feet or smaller. Exemptions are local, so check yours instead of assuming.
How much time do you have?
The notice itself controls your dates, so read it first. As examples from official sources:
- Miami-Dade County says recertification reports must be submitted by the deadline on your notice.
- Broward’s policy requires owners or associations to complete the building safety inspection by the deadline on your notice.
- For state milestone inspections, phase one must be completed by the deadline on your notice.
Some departments allow extensions in certain situations, usually requested in writing before the deadline and often through your engineer or architect. Ask the department how its process works.
What happens if the deadline is missed?
Consequences depend on the jurisdiction. Miami-Dade County says that if recertification is not obtained in time, a citation is issued and the case is referred for enforcement, with an initial penalty and possible added penalties. The county also notes properties can be referred to its Unsafe Structures Section. In Broward, the City of Hollywood says non-compliant buildings can receive a Notice of Violation and be sent to a Special Magistrate, and unsafe buildings can go to the Broward County Unsafe Structures Board.
An unanswered notice doesn’t go away, and starting early gives you the most options.
Who does what?
- The right engineer or architect: Performs the inspection and signs and seals the report. In Broward, a qualified professional also handles the electrical report.
- Owner, association or board: Hires the professional, pays for the inspection and any repairs, and makes the decisions. For condos, state law requires the association to tell unit owners about a required milestone inspection by the deadline on your notice.
- The right contractor: Performs the repairs. The building department reviews the report, issues permits and inspects.
- A permit expeditor like Permit Busters: Helps keep the paperwork moving: tracking the case, researching permit history, preparing and submitting repair permit applications, coordinating with your engineer and contractor, and following up with the department.
Where permits come in
If the engineer’s report finds repairs are needed, those repairs usually need building permits before the building can be recertified. Miami-Dade County says proper permitting must be followed before recertification. In some situations a department may require temporary shoring, which can need its own permit separate from the repair permit.
Repair permits are where many recertifications slow down: plans may come from your engineer, applications must be complete, and work must pass inspections and be closed out. Old open or expired permits can also complicate things, so check the permit history early.
Your first-steps checklist
- Read the notice carefully. Note the issuing department, the case or reference number, the notice date and every deadline.
- Put the deadlines on the calendar. Count from the date your notice says, not the date someone opened it.
- Confirm whether the building is covered. If you believe it is exempt, ask the department how to request an exemption.
- Hire the right engineer or architect. Ask about their experience with your department’s forms and portal.
- Notify the right people. Condo associations should follow the state’s unit-owner notice rule and their governing documents.
- Pull the building’s permit history. Look for open or expired permits that may need attention.
- Plan for repairs. If the report lists repairs, line up the right contractor and start the permit applications promptly.
- Track everything to close-out. Keep copies of the report, permits, inspection results and the department’s final letter or certificate.
Frequently asked questions
Does recertification apply to my single-family home?
Usually not. Miami-Dade’s program exempts single-family homes and duplexes, and the state milestone law does not apply to one- to four-family dwellings with three or fewer habitable stories. Broward and other local programs have their own exemptions, so confirm with your building department.
Can Permit Busters do the inspection?
No. The inspection and report must be done by the right engineer or architect. We can help with the permit side: researching permit history, preparing and submitting repair permit applications, and following up with the department.
What if we can’t finish by the deadline?
Contact the building department before the deadline. Some departments allow extension requests, often through your engineer or architect. Requirements vary by city and county.
Is the 40-year recertification the same as a milestone inspection?
They overlap but aren’t identical. Milestone inspections are a state requirement for certain condo and co-op buildings, while county and city programs like Miami-Dade’s recertification and Broward’s Building Safety Inspection Program cover more building types. Your department can tell you which apply to your building.
What happens if I miss the recertification deadline?
Consequences depend on the city or county that sent your notice. Code enforcement action may follow, such as a citation, a referral for enforcement, or a Notice of Violation, and buildings considered unsafe can be referred to an unsafe structures board. We can’t promise how any case will turn out, so read your notice for the specific consequences and contact the building department before the deadline. Call (954) 616-5823 to talk through your notice.
Do repairs found in the inspection need permits?
Usually, yes. If the engineer’s report finds repairs are needed, those repairs generally need building permits, and the work must pass inspections and be closed out before the building can be recertified. In some situations, temporary shoring may need its own permit. Your building department can confirm which permits apply to your repairs. Call (954) 616-5823 to talk through your notice.
Who needs to respond to a recertification notice?
The building owner is responsible for responding. For a condo or co-op, that means the association or its board. For other buildings, it is the owner, often working through a property manager. Responding usually means hiring an engineer or architect to inspect the building and file the report, then coordinating any repairs and permits. Your notice names the responsible party and the department to contact. Call (954) 616-5823 to talk through your notice.
What should I do first?
Read the notice closely. Note the issuing department, the case or reference number, the notice date, every deadline and the reports it requires. Then line up the right professionals: an engineer or architect for the inspection and report, and a contractor for any repairs. If anything in the notice is unclear, ask the building department that sent it. Call (954) 616-5823 to talk through your notice.
Get help with your recertification permits
Permit Busters helps condo boards, property managers and building owners across Miami-Dade, Broward and Palm Beach keep repair permits and department follow-ups moving. We don’t replace your engineer, contractor or attorney, and we can’t promise outcomes, but we can help you stay organized.
Call (954) 616-5823 to talk through your notice.
This article is general information, not legal or engineering advice. Requirements vary by city and county and can change, so always confirm with your building department.