It depends on what you change. In unincorporated Miami-Dade, cosmetic work like painting and new floor tile generally does not need a building permit, and neither does swapping a vanity in the same configuration. Once you move, add or alter plumbing, electrical or ventilation, or replace a shower pan, you need permits. This guide walks through Miami-Dade County’s published exemptions and its plumbing guidance, plus the 2026 state law that added a new exemption for some small projects. If your home is in a city such as Miami, Hialeah or Coral Gables, check with that city’s building department, because each city applies its own process. Approval always rests with the building official.

Work that usually does not need a permit

Miami-Dade County lists several items that are not regulated by the Florida Building Code or are exempt from permits in unincorporated areas:

  • Painting and wallpaper. The County says you do not need a permit to paint or wallpaper the interior of your home.
  • Floor surfacing. Surfacing floors with carpet, tile, brick or wood in single-family homes up to four dwelling units is on the County’s exemption list for single-family homes, duplexes, townhouses and condominium units. That list has a cap: the total cost of all the listed exempt work in any 12-month period cannot exceed $5,000.
  • Vanities and cabinets in the same configuration. Replacing a vanity inside a residential unit in the same configuration does not need a building permit. Any plumbing, ventilation or electrical work that is relocated, reconfigured or altered will require a permit.
  • Like-for-like fixture replacements. When the work is done by a plumbing contractor, the County exempts repair or replacement of faucets, toilets (water closets), bidets and sinks or lavatories. The exemption covers the fixtures only.
  • Clearing stoppages and stopping leaks, and removing and reinstalling a toilet, as long as no valves, pipes or fixtures are replaced or rearranged. If a concealed drain or water pipe has to be replaced, the County treats that as new work that needs a permit.
  • Switches and outlets. Repair or replacement of standard wall switches and receptacles (15 to 20 amps, 120 volts or less) is exempt.

Work that needs a permit

The County’s guidance says interior renovations that knock down a wall or alter or repair the electrical or plumbing system need a permit. In a bathroom, that typically covers:

  • Moving or adding fixtures, such as relocating a toilet, adding a second sink or turning a tub into a walk-in shower with new drain locations.
  • Replacing a shower pan. Miami-Dade’s plumbing homeowner FAQ says a shower pan replacement needs a stand-alone plumbing permit.
  • Tub-to-shower conversions. The County’s FAQ says it depends on the scope of work, and that when tiles and cement boards are replaced, a building permit is required.
  • Shower and tub valves. The County notes these come up often because of anti-scald requirements, and that shower and tub valves must be certified to the applicable ASSE standard.
  • New electrical circuits, lighting or exhaust fans that change the existing wiring or ventilation.
  • Removing or moving walls, or any structural work.

The 2026 HB 803 exemption

Beginning July 1, 2026, Florida House Bill 803 created a new permit exemption for some small home improvement projects valued under $7,500. Miami-Dade’s exemptions page explains how it applies in unincorporated areas:

  • It covers single-family homes, duplexes and townhouses, and accessory structures on those properties. Units in multifamily buildings do not qualify.
  • It does not apply to properties partly or fully in a flood hazard area. You can check your flood zone on FEMA’s Flood Map Service Center.
  • Electrical, plumbing, structural, mechanical and gas work still requires permits, even under $7,500.
  • A project cannot be split into smaller phases to avoid permitting rules.
  • To use it, the owner or contractor submits a written request through the County’s portal with a copy of the contract or other documents showing the nature and value of the work.

For most bathroom remodels, the plumbing and electrical pieces mean permits are still required.

Condos and HOAs

In a condominium, association approval and government permitting are separate questions. Confirm both for the proposed work. Our guide on condo renovation approval vs. a permit explains the difference, and our condo renovation permit page covers the permit side.

Who can pull the permit

Contractors can apply, and Miami-Dade allows qualifying property owners to apply as owner-builders by completing an Owner-Builder Disclosure Statement. The County’s permitting assistance team says some permits accept sketches prepared by the owner with their guidance, while others need a design professional. Read our owner-builder checklist before deciding.

Inspections and closing the permit

Plan the job around the inspections. Miami-Dade’s inspection guidance says work must stay accessible and exposed until it is approved, and plumbing or electrical work covered before inspection will have to be exposed. Then make sure the permit gets a final inspection and closes. An open bathroom permit can come up later when you sell. Our guide to checking open and expired permits shows how to verify it.

Already remodeled without a permit?

If a past bathroom remodel moved plumbing or wiring without a permit, it may need to be legalized. See How to Legalize Unpermitted Work in South Florida. If your property is in Palm Beach County, see our Palm Beach County bathroom remodel guide.

Frequently asked questions

Do I need a permit to retile my bathroom in Miami-Dade?
In unincorporated Miami-Dade, surfacing floors with tile is on the County’s exemption list for homes, subject to a $5,000 aggregate cap on listed exempt work in 12 months. If the job replaces cement board or a shower pan, permits are required.

Can I replace my vanity without a permit?
Replacing a vanity in the same configuration does not need a building permit, according to Miami-Dade. If the plumbing, ventilation or electrical is relocated, reconfigured or altered, a permit is required.

Does replacing a toilet or faucet need a permit?
Miami-Dade exempts repair or replacement of toilets, faucets and sinks when a plumbing contractor does the work and only the fixture is replaced. Moving the fixture or changing the pipes needs a permit.

Does the new $7,500 HB 803 exemption cover my bathroom remodel?
Usually not entirely. The exemption excludes plumbing, electrical, structural, mechanical and gas work, multifamily units and homes in flood hazard areas. It can apply to some finish work on eligible homes.

Do these rules apply in the City of Miami or Hialeah?
Not automatically. The exemptions described here are Miami-Dade County’s for unincorporated areas. Cities run their own building departments, so confirm with your city before you start.

Talk through your project

Permit Busters is a South Florida permit expeditor. We help homeowners, contractors and real estate agents figure out what a bathroom job needs, prepare the permit paperwork and close out old bathroom permits. See our residential permits page.

Call (954) 616-5823 to talk through your project.

This page is general information, not legal advice. Rules vary by city and county and can change. The building department with jurisdiction makes every permit decision, so confirm current requirements with that office.

Call (954) 616-5823