How to Find and Close an Open or Expired Permit in Homestead
If a title search, inspection report or buyer’s question turned up an open or expired permit on a Homestead property, the City of Homestead Building Department is where it gets resolved. This guide covers who issues permits in the city, how to look up records, what happens when a permit expires, and how to get inspections done. Every case is different, and approval always rests with the city’s building officials.
Who issues permits in Homestead?
The City of Homestead Building Department enforces codes and regulations established by the State of Florida, Miami-Dade County and the City of Homestead for construction, alteration and maintenance of buildings in the city. The city says the department issues permits, reviews plans, conducts inspections, and issues certificates of occupancy and completion.
The department is at City Hall, 100 Civic Court, Homestead, FL 33030. The Building Department phone number is (305) 224-4500, and the fax is (305) 224-4539.
The city has launched Electronic Permitting & Licensing – B.U.I.L.D. (EPL-B.U.I.L.D.), an online platform for submitting applications, uploading documents, tracking progress and paying. The city’s Building Department page also points to online services for checking plan review status or inspection results.
How to look up permits in Homestead
- Use the city’s Check Permit Status tool. You can search by permit number, folio number, or street number and street name. The city says not to enter a street direction (E, W, N or S) or a street suffix (St., Ave., Blvd. and so on). A list of potential matches will be displayed. The same form also offers scheduling of inspections.
- Or use EPL-B.U.I.L.D. to track applications and documents in the city’s newer electronic permitting system.
- Use the city’s online services to check plan review status or inspection results.
- Open each record and note its status. Make a list of every permit that isn’t closed, with its permit number and the last inspection result.
If you can’t find a record, or the status isn’t clear, call the Building Department at (305) 224-4500 and ask them to review the property with you.
What “open,” “expired” and “final” mean
- Open: The permit was issued, but the required inspections haven’t all been approved, so the permit hasn’t been closed out.
- Expired: The city says permits expire after 180 days if no required inspections have been approved. If a permit expires before final inspections, it becomes null and void, and the project is in violation of the code.
- Final: The required final inspections have been approved. In some cases, a Certificate of Completion or a Certificate of Occupancy may also be required.
Typical steps to close or renew a permit
1. Confirm what is still open. Search Check Permit Status or EPL-B.U.I.L.D., and list every permit that isn’t closed.
2. Schedule the missing inspections if the permit is still active. The city says all possible inspections are listed on the back of the permit card, and it is the contractor’s or owner’s responsibility to call for them. The permit and the recorded Notice of Commencement (for all work over $2,500 in job value) must be displayed on the job site. Have the approved plans available and provide access, so the inspection can be completed. To schedule, reschedule or cancel an inspection, call 305-224-4500 or email inspections@homesteadfl.gov. The city also offers online inspection scheduling.
3. If the permit has expired, call the Building Department. The city says that if a permit expires before final inspections, you should call the office, and it will help you activate the permit or apply for a completion permit. Its stated interest is seeing the project completed, including all final inspections.
4. Handle work done without a permit, or a violation on the property. The city’s owner-builder FAQ says that if there is a violation on the property, no building permit will be issued to a homeowner to cover illegal work. The work must be done by a general contractor or a specialty contractor licensed to do the work, permits for all of the work must be obtained, and an architect’s or engineer’s report may be required to certify that the work was done in accordance with the applicable code, as a substitute for required inspections. Talk with the Building Department about what it will need. Approval rests with the city.
If the original contractor is gone, a new contractor (or the owner, if eligible) will usually need to take over the permit before it can move forward. Ask the Building Department what it requires.
Owner-builder notes
Homestead allows owner-builder permits for residential projects, with limits. According to the city’s Building Permits page and FAQ:
- If the owner plans to complete the work, attach proof of ownership (a warranty deed or tax receipt) and sign the Owner/Builder Affidavit.
- The owner must prove to the Building Official, or a designee, that they have the knowledge and ability to do the work. A test will be administered.
- An owner may apply for a permit, supervise and do the work on a single-family or duplex residence for their own use or occupancy, and not intended for sale.
- No more than one permit will be issued to an owner for construction of a new single-family or duplex residence in any 24-month period. Permits for alterations and additions, or plumbing, electrical, mechanical or gas installations, will be issued only in connection with one single-family or duplex residence in any 24-month period, although more than one permit may be issued for such work on the same residence during that period.
- The owner must come in person for review of the permit documents and application. The permit application and affidavit must be signed and notarized.
Free South Florida Owner-Builder & Contractor Permit Checklist
Get our free checklist: what to gather and the steps to follow before you apply.
FAQ
How do I search Homestead permits online?
Use the city’s Check Permit Status tool. Search by permit number, folio number, or street number and street name, without a street direction or suffix. You can also use EPL-B.U.I.L.D. to track applications.
When does a Homestead permit expire?
The city says permits expire after 180 days if no required inspections have been approved. If a permit expires before final inspections, it becomes null and void.
What if my permit already expired?
The city says to call the Building Department, and it will help you activate the permit or apply for a completion permit.
How do I request an inspection?
Call 305-224-4500 or email inspections@homesteadfl.gov to schedule, reschedule or cancel. The city also offers online inspection scheduling. Display the permit and, when required, the recorded Notice of Commencement.
Can I pull my own permit as an owner-builder?
Possibly, for a single-family or duplex residence for your own use and occupancy, if you provide proof of ownership, sign the Owner/Builder Affidavit, appear in person, and demonstrate to the Building Official that you can do the work. A test is administered, and other limits apply.
Get Permit Help
Have an open or expired permit in Homestead? Permit Busters can help you review the city records, figure out what the city still needs, and prepare the paperwork to close it out. Permit Busters is a private permit expediting company, not a government agency, law firm, contractor, engineer, or architect, and not affiliated with any city or county. Get Permit Help: call (954) 616-5823 or email info@permitbusters.com, Monday through Friday, 9 AM to 5 PM.
This guide is general information, not legal or engineering advice. Requirements change, and approval rests with the City of Homestead. Confirm details with the city before you act.
