Commercial Buildout Permit Help in South Florida
A commercial buildout usually involves more than one approval: the building permit, trade permits, and the certificates that let a business open. Permit Busters, LLC is a South Florida permit expeditor that helps contractors, business owners, landlords and investors organize those steps for restaurant, retail, office, medical, warehouse and tenant improvement projects.
We do not issue or approve permits, and we do not prepare or seal plans. The building official decides each permit. We help you understand what the office is likely to ask for, coordinate with your contractor and design team, and follow up with the office.
What a commercial buildout can involve
The scope is different for every space, but a buildout often touches several of these items. The building official tells you which ones apply to your project.
- Restaurant, retail, office, medical office, salon, fitness studio and warehouse buildouts
- Tenant improvement permits inside an existing space
- ADA accessibility items raised in plan review
- Fire alarm and fire sprinkler permits
- Commercial electrical, plumbing and mechanical permits
- Certificates of occupancy, completion and use at the end of the job
Miami-Dade County explains that a master permit covers all phases of a project, including the electrical, plumbing, mechanical and roofing elements, and that subsidiary permits and shop drawings may be required after the master permit is issued. Your permit card lists what applies. Plan these pieces together so one missing trade permit does not hold up a final.
Plans, drawings and review
For a master permit, Miami-Dade requires detailed drawings that show the site plan, structure dimensions, and the electrical, mechanical and plumbing or gas elements, with the proper calculations. The drawings must be signed and sealed by a design professional, meaning an architect or engineer, and can be submitted digitally signed and sealed. Permit Busters does not prepare signed and sealed plans. We can help coordinate that step with your design professional. See our engineering and architectural page.
Miami-Dade also says all demolition projects and all renovation projects over 160 square feet at commercial facilities require review for asbestos and approval from the County’s Division of Environmental Resources Management. If your buildout includes demolition inside an existing space, ask about this early.
If the plans change after the permit is issued, a revision may be needed. See our guide on permit revisions when plans change.
Opening the business: certificates
Miami-Dade explains that a Certificate of Occupancy or Completion confirms that a building or renovation project was completed in compliance with applicable codes. A Certificate of Use confirms that the business is allowed in the zoning district where it is located, and is evidence that the structure has the proper certificate of occupancy for the proposed use. In unincorporated Miami-Dade, a Certificate of Use is required before opening a business, including when a building is altered or enlarged or an existing building changes occupancy, name or type of business. Cities set their own rules, so ask the city that has your address.
The order matters: the County says a Certificate of Occupancy is a prerequisite to the Certificate of Use. Learn the difference in our guide to the certificate of completion vs. certificate of occupancy, and see our permit closeout page if an older permit for the space is still open.
Who we help
Homeowners
You own a home and are starting a business from a commercial space, or you own a mixed-use property. We help you see which office handles the address and what the commercial side of the project will need.
Contractors
You are building out a space and need the permit paperwork organized. We help assemble the package, track comments from plan review, request inspections and watch for missing trade permits so your schedule is not held up by paperwork.
Businesses
Restaurants, retail stores, medical offices, salons, fitness studios, offices and warehouses. We help you understand the permit path from lease to opening and coordinate with your contractor and landlord.
Real estate agents
A tenant is asking about a space that was built out earlier, or a property has an open permit. We help you see what is on record so you can set expectations with a tenant or buyer. See our guide for real estate agents.
How it works
- Tell us about the space. Share the address, the type of business, the scope and who your contractor and design professional are.
- We confirm the office. City, county or another agency: we check the address against the official records.
- We outline the path. You get a plain-language list of the building permit, likely trade permits and certificates, and who needs to provide what.
- We coordinate your team. Your architect or engineer prepares and seals the drawings. Your contractor handles the work. We organize and submit the permit paperwork.
- We follow comments. If the office requests corrections, we help route them to the right person.
- We help schedule inspections and follow up through the final and the certificates.
How the counties handle commercial projects
Miami-Dade County
Unincorporated Miami-Dade and each municipality have their own review process. Miami-Dade explains its master and subsidiary permits, certificates and Certificate of Use on its website. See the Miami-Dade permit expeditor page.
Broward County
Most Broward cities run their own building departments and checklists. See Broward County permit help.
Palm Beach County
The County Building Division handles unincorporated Palm Beach County, and many cities have their own offices. See Palm Beach County permit help.
Related commercial pages: commercial permits and the guide on which department issues your permit.
What to have ready
- The address, suite or bay number, and the type of business
- Your lease, or the landlord’s name and contact information
- The scope of work and your contractor’s name
- Drawings, or your design professional’s contact information
- Existing permit numbers, certificates and any open inspections for the space
Commercial buildout permit questions
Do I need a permit to build out a commercial space?
Interior alterations to a commercial space generally go through the building department, and the office decides what your scope requires. Miami-Dade explains that remodeling, renovation and layout changes are covered by a master permit. Confirm with the office that has your address.
Do I need drawings from an architect or engineer?
For a Miami-Dade master permit, drawings must be signed and sealed by a design professional, meaning an architect or engineer. Permit Busters does not prepare signed and sealed plans, but can help coordinate that step.
What is the difference between a Certificate of Occupancy and a Certificate of Use?
Miami-Dade says a Certificate of Occupancy confirms a building or renovation was completed in compliance with applicable codes. A Certificate of Use confirms the business is allowed in the zoning district and that the structure has the proper certificate of occupancy for that use. A Certificate of Occupancy is a prerequisite to the Certificate of Use. See our guide to the certificates.
Do I need a Certificate of Use to open?
In unincorporated Miami-Dade County, one must be obtained before opening a business. Cities in all three counties have their own rules, so ask the city that has your address.
Does demolition inside a commercial space need anything extra?
Miami-Dade says all demolition projects and all renovation projects over 160 square feet at commercial facilities require asbestos review and approval from its Division of Environmental Resources Management. Ask your office what applies to your address.
Will I need separate permits for electrical, plumbing and mechanical work?
Often. Miami-Dade explains that subsidiary electrical, mechanical and plumbing or gas permits may be required after the master permit is issued, and your permit card lists them. Other offices set their own rules.
What if the space has an open or expired permit from a previous tenant?
An old permit on a space can complicate the new one. We can help you check what is on record and what the office needs to close it. See our permit closeout page and after-the-fact permit page.
Who decides whether a permit is approved?
The building official at the city or county that issues it. We help you organize the submittal and follow up with the office.
Related pages
Related services: Commercial permits · Permit closeout · After-the-fact permits · Engineering and plans · Window and door permits · Roofing permits · Condo renovation permits · Change of contractor help · Code violation help · All services
County pages: Miami-Dade County · Broward County · Palm Beach County
City pages: Medley · Opa-locka · Sweetwater · West Miami · Florida City · Doral · Hialeah · Miami · Fort Lauderdale · Pompano Beach · Boca Raton
Guides: Certificate of completion vs. certificate of occupancy · Which department issues your permit? · Plans changed mid-project? · What if a final inspection fails? · Demolition permits in South Florida · Closing a permit when the contractor is gone
Permit Busters, LLC · Lauderhill, FL 33351 · Miami-Dade, Broward and Palm Beach counties. We do not issue or approve permits, and this page is general information, not legal advice.
Have a permit problem? Talk to a permit expeditor.
Call or book a consultation and we will go over where things stand.